From 7aef80b883d76b90b81fd6ef828dde9ee2425b33 Mon Sep 17 00:00:00 2001 From: otivm Date: Sat, 25 Apr 2026 14:57:41 +0000 Subject: [PATCH] Update TESSERA stage 05 status in roadmap --- docs/roadmap.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/docs/roadmap.md b/docs/roadmap.md index 87ba496..bf5a819 100644 --- a/docs/roadmap.md +++ b/docs/roadmap.md @@ -127,7 +127,7 @@ Azgaar's Fantasy Map Generator produces GeoJSON and SVG exports of political geo These are verifiable claims about what is built and running as of April 2026. -**TESSERA global pipeline:** Stages 00–04 complete. Elevation, terrain, hydrology, geology flag, and geology deposit encoded for 8,591,961 H7 tiles. Stage 05 (geology assembly) written, verified, awaiting run instruction. Stage 06 (culture sampling, four Mesolithic cultures) not yet written. Global SpatiaLite database assembling on Dell pipeline node. +**TESSERA global pipeline:** Stages 00–04 complete. Elevation, terrain, hydrology, geology flag, and geology deposit encoded for 8,591,961 H7 tiles. Stage 05 (geology assembly) running as of 2026-04-25. Phase 1 ~80% complete, ETA phase 2 complete ~2026-04-27. Stage 06 (culture sampling, four Mesolithic cultures) not yet written — this is the byte that OTIVM-VIII depends on for tracing goods to Mesolithic cultures. Global SpatiaLite database assembling on Dell pipeline node. **TESSERA v3.0 scoped dataset:** Not yet assembled. Depends on stages 05 and 06. Target: four-culture bounding box, <10 GB, fits Proliant local-lvm.